Cement slab day 1

The contractor in the black hat got the two men lined out on January 30th, and they’ve been shoveling dirt eight hours a day ever since.

First they dug a “footing” all around the perimeter of the future slab.  Then they dug out the high spots under the house and piled the wheelbarrows of dirt on the drain field (not sure that’s a good idea).

Slab day 2

Then they ran a level string all the way around the perimeter.

Cement slab

Then they take one section at a time and run these level lines and proceed to go back and get the dirt they dug out and put it back in to make the whole thing level.  They are just now finished with the leveling.

Plastic sheeting

Next there is the plastic sheeting laid down to keep dirt clods from migrating upward and making blemishes in the concrete.  Contractor Sam says it does happen.  River sand serves the same purpose.  Plastic is quicker to obtain and cheaper.  Also serves as a moisture barrier.

Setting forms

Now they are setting the forms using boards that will shape the edges of the concrete mix and hold it in.

Driveway preperation

And while I was driving to Lafayette to meet LilSis, the heavy equipment sneaked in and tore up this part of the driveway and yard in order to make one new solid drive and cut down on the muddy potholes we’ve been experiencing every time a wheel slips off into the yard.  They also leveled the front yard somewhat.

deckdirt

Now, there’s a big mound of dirt in the back yard that came from the driveway.  Oh, and notice my plants on the landing?

I had to go into town and pay for the concrete which will be delivered tomorrow morning.  While I was there, I asked tons of annoying questions, which will result in a very informative post for you coming tonight.

Sneak peak

Here’s a sneak peak!

cleanupcontinues-004cleanupcontinues-001

Daboo and his friend Derrick finished cleaning up the rest of the storm debris from the back yard.  Thanks a bunch, guys!

See the boards in the back of my truck?  I’m off to cut them into slats for the new bunk beds!!!!  Photos later!

Now, back to work!

BW

PS Who will finish the catwalk and front steps?

Similar Posts

Leave a Reply to Bunk Beds Plans Cancel reply

Your email address will not be published. Required fields are marked *

9 Comments

  1. Fine Fine I’ll do the catwalk….where did I put my stilletos? Oh wait, wrong catwalk. Sorry, it’s manual labor, I’m allergic.

  2. I mean that girl is a HOOT and a half!!!! Catwalk and Frontsteps sound like some kind of dance!!! But now I’m back and loaded with more interesting photos and more info.

  3. No need for stilletos need remesh though and order more than you need for tomato cages. They are doing it right I think. Used to pour some ‘cement’ as a child for grain bins and driveways and garages. Back is totally screwed up this week worse everyday. Thinking about cashing in the 401k for MD20-20 and living on the levee or beach. Naptime.

  4. Through all these pictures and this is the first time that I have noticed that the little shed is gone (there where we parked). Must not be paying attention. Everything is looking great!

    blufloyd…..question………is that MD20-20 (mad dog wine) by chance?………….LOL

  5. The digging is backbreaking work but wow is it important in your case. What re your plans for the under-area? Will it be parking/garage/storage?

    Anyhow, can’t wait for the next post…should be interesting!

  6. So that’s the twitch in my neck. Don’t go blowing that around. I try to keep my employment top secret on the web. Mostly cause I just fish.